How to stop wood floors from squeaking — How to stop old wood floors from squeaking — Old wood

How to stop wood floors from squeaking - How to stop old wood floors from squeaking - Old wood

Do it yourself: How to stop old wood floors from squeaking?

Are you old wooden floors creaky, noisy and squeaking? Read on for some do it yourself tips to help you tackle the problem at home.

Where is the squeak located?

A floor as a rule is made of three layers from the bottom up joists, the subfloor, and the floor. The area that is squeaking will need to be located. A joist is the parallel planks or beams that hold up the planks of the floor. The subfloor above the joists is usually a rough floor on which the final floor is constructed. Squeaks will happen when one or more of the layers separate and rub together caused by constant use and wearing away on the floor.

Temporary problem solver:

By using graphite or talcum powder between the squeaking floorboards, a squeak may be temporarily fixed. However for a permanent repair the specific parts of the layers of flooring that is loose will need tightening.

Main floor squeaking:

If you can reach the joists from the basement, the problem may be resolved by repairing or adding bridging. Hammer steel bridging (strips of metal) between joists. The forked or sharp end of steel bridging is hammered into one joist and the L shaped end into the opposite one. The steel bridging will form an X.

Solid bridging:

Use lumber to make a solid bridging. Cut the board the same dimensions as the width of the joists and secure them between the joist by nails.

A shim of metal or stone or most often wood is a thin wedge used to fill a space to level an area. To use shims carefully hammer the glued shim between the joist and the subfloor under the area that is squeaking. The wedge must be the correct width in order to keep the floorboards on the top level.

Use block of wood for warping:

If the joist has warped push a 2X6 block of wood against the warped joist level with the subfloor and nail it to the joist. If necessary, a jack can used to lift the floor enough so the block will be square with the subfloor.

Repair flooring if the floor has warped by using wood screws to pull the floor and subfloor together. Place a weight on the buckled floor. From below use, wood screws making sure it drills into only ½ of the flooring. Drill a pilot hole and place a washer under the head of the screw then secure the boards

Cannot get to the floor from below?

If this is the case, the repairs will need to be completed from the finished flooring on top. Secure warped floors at the higher points of the arch by inserting nails or screws through the floorboards. The nails or screws will need to enter the joist below at least 1-½ inches. Use colored wood putty to hide the nails or screws. Drill pilot holes that are angled then use galvanized finishing nails into the sub floor and joist.

Sagging floors are more serious:

A critical occurrence is a sagging floor. It will affect every floor above and cause doors and windows to stick and ceilings and walls will crack. Ultimately sagging floors can cause roof leaks as well. This may need the attention of a contractor or engineer. A homeowner may be able to correct minor sagging or prevent a more severe one from becoming worse.

To begin the task of leveling the sagging floor use two jack posts or short house jacks placed on a heavy wooden beam. If the short house jacks are used, you will need two 44-extension posts in order to reach the joists. Place a heavy 4X8 wooden beam on top of the extension posts. Slowly raise the jacks only until you feel resistance and then stop. Wait a period before continuing up to 24 hours. Turn the handle no more than a quarter of a turn every 24 hours until the floor is level. It is very important to adhere to the ¼ turn every 24 hours. Check with your particular building department because building codes differ and they will determine how to deal with the floor once leveled.

Do it yourself: How to stop old wood floors from squeaking?

Are you old wooden floors creaky, noisy and squeaking? Read on for some do it yourself tips to help you tackle the problem at home.

Where is the squeak located?

A floor as a rule is made of three layers from the bottom up joists, the subfloor, and the floor. The area that is squeaking will need to be located. A joist is the parallel planks or beams that hold up the planks of the floor. The subfloor above the joists is usually a rough floor on which the final floor is constructed. Squeaks will happen when one or more of the layers separate and rub together caused by constant use and wearing away on the floor.

Temporary problem solver:

By using graphite or talcum powder between the squeaking floorboards, a squeak may be temporarily fixed. However for a permanent repair the specific parts of the layers of flooring that is loose will need tightening.

How to stop wood floors from squeaking - How to stop old wood floors from squeaking - Old wood

Main floor squeaking:

If you can reach the joists from the basement, the problem may be resolved by repairing or adding bridging. Hammer steel bridging (strips of metal) between joists. The forked or sharp end of steel bridging is hammered into one joist and the L shaped end into the opposite one. The steel bridging will form an X.

Solid bridging:

Use lumber to make a solid bridging. Cut the board the same dimensions as the width of the joists and secure them between the joist by nails.

A shim of metal or stone or most often wood is a thin wedge used to fill a space to level an area. To use shims carefully hammer the glued shim between the joist and the subfloor under the area that is squeaking. The wedge must be the correct width in order to keep the floorboards on the top level.

Use block of wood for warping:

If the joist has warped push a 2X6 block of wood against the warped joist level with the subfloor and nail it to the joist. If necessary, a jack can used to lift the floor enough so the block will be square with the subfloor.

Repair flooring if the floor has warped by using wood screws to pull the floor and subfloor together. Place a weight on the buckled floor. From below use, wood screws making sure it drills into only ½ of the flooring. Drill a pilot hole and place a washer under the head of the screw then secure the boards

Cannot get to the floor from below?

If this is the case, the repairs will need to be completed from the finished flooring on top. Secure warped floors at the higher points of the arch by inserting nails or screws through the floorboards. The nails or screws will need to enter the joist below at least 1-½ inches. Use colored wood putty to hide the nails or screws. Drill pilot holes that are angled then use galvanized finishing nails into the sub floor and joist.

Sagging floors are more serious:

A critical occurrence is a sagging floor. It will affect every floor above and cause doors and windows to stick and ceilings and walls will crack. Ultimately sagging floors can cause roof leaks as well. This may need the attention of a contractor or engineer. A homeowner may be able to correct minor sagging or prevent a more severe one from becoming worse.

To begin the task of leveling the sagging floor use two jack posts or short house jacks placed on a heavy wooden beam. If the short house jacks are used, you will need two 44-extension posts in order to reach the joists. Place a heavy 4X8 wooden beam on top of the extension posts. Slowly raise the jacks only until you feel resistance and then stop. Wait a period before continuing up to 24 hours. Turn the handle no more than a quarter of a turn every 24 hours until the floor is level. It is very important to adhere to the ¼ turn every 24 hours. Check with your particular building department because building codes differ and they will determine how to deal with the floor once leveled.


Leave a Reply